Skip to content
Trust Quality AssuranceManufacturing Intelligence

Semiconductor & advanced packaging

Isolate the tool that moved, not the lot that failed

Parametric drift rarely announces itself in a single measurement. The platform monitors tool-level parametric behaviour, chamber-to-chamber matching and yield binning together, so engineering time goes into fixing the tool rather than proving which one caused the excursion.

excursion response time
-34%
parametric readings per day
1.6 M
query on hot data
< 1 s
earlier drift detection
42 min

Standards supported

  • ISO 9001
  • SEMI practices
  • Customer PCN requirements

Typical monitored characteristics

  • Film thickness
  • Critical dimension
  • Overlay
  • Etch depth
  • Sheet resistance
  • Bin yield

Where the cost sits

The problems we start from

These are the recurring findings from discovery workshops in this sector. If none of them describe your operation, a pilot is probably premature — and we will say so.

Operational problems

  • Excursions are confirmed at electrical test

    By the time wafer sort reveals the problem, several lots have passed through the same tool and the suspect population is large.

  • Chamber mismatch hides in aggregate data

    Averaged tool statistics look stable while one chamber drifts, so the signal is masked precisely where it matters.

  • Yield analysis is a specialist activity

    Correlating parametric, defect and bin data requires bespoke scripts owned by a handful of engineers, which does not scale across fabs.

  • Customer PCN and audit evidence is manual

    Change notification and qualification evidence is assembled from multiple systems for each customer request.

Engineering constraints

  • Extremely high dimensionality

    Thousands of parameters per tool and step mean univariate charting alone produces more noise than signal.

  • Long, multi-step routes

    A wafer visits hundreds of operations, so cause and effect can be separated by weeks of processing.

  • Strict data confidentiality

    Recipe and process data is core IP, which frequently rules out any multi-tenant model training or external egress.

  • Legacy fab systems

    Older MES and equipment interfaces expose data in inconsistent, poorly documented formats.

Platform capabilities

How the platform is configured for semiconductor

Same architecture, same modules — configured against the characteristics, sampling logic and evidence expectations of this sector.

Tool and chamber matching

Per-chamber capability comparison against the tool fleet, so a single drifting chamber is isolated instead of averaged away.

Multivariate excursion detection

Models learn the normal operating envelope per recipe and step, catching combinations of parameters that individually look acceptable.

Route-aware genealogy

Wafer and lot history across every operation, so a bin signature can be traced back to the operations and tools it passed through.

Bin and parametric correlation

Links sort bins and parametric results to upstream process data without a bespoke analysis script per investigation.

Air-gapped deployment

Full on-premise deployment including model serving, with offline update bundles when no egress is permitted.

Typical integrations
  • OPC UA
  • Legacy MES via SQL
  • Ignition
  • On-premise model serving
  • Okta
  • Databricks
All integrations

Business outcomes

What changed for operations like yours

Customer-reported figures measured against documented pre-deployment baselines. Ranges, not single numbers, because process maturity dominates the result.

Excursion response time
-34%
Earlier detection
42 min
Wafers at risk
-70%
Data egress required
0

Excursion response time

Detection to containment decision

Earlier detection

Median across monitored tool sets

Wafers at risk

Smaller suspect population per excursion

Data egress required

Air-gapped option available

KPIs a programme is measured onAgreed in the pilot scope before deployment, with the baseline recorded first.
KPITypical movementMeasurement note
Excursion detection lag-30% to -50%Versus electrical-test discovery
Wafers held per excursion-50% to -70%Route-aware scoping
Line yield+0.5 to +1.5 ptHighly process dependent
Analysis cycle timeHours → minutesNo bespoke script per investigation
Tool matching variance-25%Chamber-level capability convergence

Expected ROI

A value case your controller can interrogate

Every line below is an assumption, not a promise. During a pilot each one is replaced with a measured figure from your own baseline, which is what makes the business case defensible in a capital review.

Illustrative annual valueFab with 40k wafer starts per month and €12 M annual yield loss
Value driverAssumptionAnnual
Yield improvement+0.8 pt line yield€2.1 M
Reduced material at riskSmaller holds per excursion€640k
Engineering productivity4 yield engineers, 20% time recovered€210k
Faster qualificationShorter tool and recipe qualification cycles€300k
Indicative totalBefore platform and integration cost€3.25 M

Payback

6–12 months

From first connector to cumulative break-even

How we validate it

  • Baseline recorded before any change
  • Success criteria written into the pilot scope
  • Measured comparison in the pilot report
  • Exit conditions agreed up front

Illustrative model. Semiconductor value cases are validated per tool set during a scoped pilot.

Deployedaccount anonymised under NDA
Chamber-to-chamber comparison isolated the tool responsible for a parametric shift that had previously been attributed to material variation, cutting excursion response time by a third.
Analog fab · 200 mm · air-gapped deployment

Start the evaluation

Find out where quality drift is hiding in your plant.

Bring one line, one defect family or one audit workflow. We will map the available data sources, quantify the cost of the current detection delay, and show the fastest route to measurable control.

  • 45-minute technical walkthrough

    With a solution architect who knows manufacturing data, not a scripted demo.

  • NDA before any data review

    We can assess feasibility from sample exports without production access.

  • Written pilot scope

    Baseline metrics, success criteria and exit conditions agreed up front.